Tiszaroffi flood control reservoir, 2010

Client: Central Directorate for Water Management and Environment
(Design no.: 1214)

The reservoir is on the left side of the Tisza River, between the following settlements: Tiszaroff, Tisza-gyenda and Tiszabő. It is located in the flood basin no. 2.82, which belongs to the Middle-Tisza Region Environment and Water Management Directorate. The reservoir is bordered by a 9 km long section of the existing flood protection levee no. 10.07 between Tiszaroff and Tiszabő and by new levees.

 

Nagykunság flood control reservoir, 2007

Client: Central Directorate for Water Management and Environment
(Design no.: 1214)

The reservoir is on the left side of the Tisza River, near the Nagykunsági main channel, in the flood basin no. 2.82, which belongs to the Middle-Tisza Region Environment and Water Management Directorate, between the Tiszabura-Abádszalók road and Tiszagyenda-Kunhegyes minor road.

 

Improving the Conveying Capacity of the High-water Channel

Implementation Plan, 2003-2004

VTT elerintett folyoszakaszClient: Central Directorate for Water Management (OVF)

According to the concept of the New Vásárhelyi Plan, enhancing flood safety in the Tisza Valley means the reduction of flood levels by:

  • improving the conveying capacity of the high-water channel and by realizing a flood control reservoir system in the Hungarian part of the floodplain
  • combining the diversion of extreme flood peak flows and the revitalisation of reclaimed floodplains with the help of controlled releases.

Read more...

 

Hanyi-tiszasüly flood control reservoir, 2010

Client: Central Directorate for Water Management and Environment
(Design no.: 1214)

The area of the reservoir is in the flood basin no. 2.37, which belongs to the Middle-Tisza Region Environment and Water Management Directorate. The reservoir is bordered by the Tiszasülyi main channel from south, by the Jászsági main channel from south-east, by the Hanyi-éri main channel from east, by the Pélyi channel and by the Pély-Jászkisér road from north and the Jászkiséri main channel from west.

 

Floodplain improvement between Szolnok and Tiszajenő

 

VTT Tender III. Koncepciós terv, 2005

Client: National Inspectorate for Environment, Nature and Water (OKTVF)
(Design no.: 1215)

The most important factors obstructing the water flow on the middle section of theTisza include ground features and the vegetation cover of the floodplain. In order to improve flow conditions, the following interventions are planned: creating high-water channels in the floodplain, levee relocations and lowering summer levees.

Several calculations have been carried out to analyse the water level reducting effects of the engineering interventions to be implemented in the high-water channel.

Read more...

 

Cigánd-Tiszakarád flood control reservoir, 2010

Client: Central Directorate for Water Management and Environment
(Design no.: 1214)

The reservoir is in the flood basin no. 2.02. in the Bodrogköz area, on the administrative area of the following settlements: Nagyrozvágy, Cigánd and Pácin. The boundary of the reservoir consists of new levees and the appr. 300 m long section of the existing flood protection levee of Zalkod-Zemplénagárd (no. 08.05) between the pump station of Ricse and the road bridge in Cigánd.

 
Management

Péter Rosza
Managing Director

Péter Farkas
General Manager

Contact

VIZITERV Consult Ltd.
Angol utca 32
1149 Budapest

E-mail:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Telephone:
(+36 1) - 384 4224

Fax:
(+36 1) - 364 2429

MSZ EN ISO 9001

VIZITERV Consult Kft. is certified in accordance with EN ISO 9001 since 2000