References Water management and -regulation

References: Water management, river training and lake regulation

 

A. Complex water managment systems

Concept study on the development of the complex flood protection – water management – nature protection of the Túr water system; ecological review, water quality examinations
2006
Adaptation of the uniform localization plan of the Bereg basin in Ukraine (TACIS CBC B-7-521)
2006
Updating the Hungarian – Ukranian excess water protection regulations (INTERREG HU-UK-2003-9)
2005
Sample project for developing the water management and water protection of groundwaters which ensure the the drinking water supply of Subcarpathia in the future
2005
Development of the complex water management – nature protection – land rehabilitation sample project for the Ukranian Bereg floodplain
2005
Technical and hydrological feasibility study for the land management sample areas in the Bodrogköz feasibility study 2004
Reconstruction of the Csaroda channel between the 0+000 and 18+450 km sections (Development of the Bereg drainage system – Phase I.) preliminary environmental impact assessment 2003
Development of water management and flood protection of the Eger-Rima Laskó water system study 2003
Reconstruction of the right side levees of the Tisza River between the 27+600 and 28+900 km sections (Csobaj) investment program 2001
Reconstruction of the right side levees of the Tisza river in the Bodrogköz area (total length:~68 km) preliminary and final designs 1999-2002
Regional water management plan for the catchment area of the Lonyai Main Canal study 1998
Szentgotthard Industrial Park: environment protection, flood protection and water management designs, extension of the water supply system study 1998
Water supply of the Szigetköz flood plain study 1998
Putting into operation of the Dunakiliti reservoir and dam study 1998
Ecological regulation of the bed of Old-Danube study 1998

 

B. River training

Developing a ultrasonik discharge measuring system on the rivers Túr and Kraszna
2006
Bank protection at Kisar final design 2005
Right side bank of the Tisza River; Tiszakarád final design 1999
Right side bank of the Tisza River; Révleányvár final design 1999
Right side bank of the Tisza River; Zemplénagárd final design 1999
Right side bank of the Tisza River; Zalkod final design 1999
Left side bank of the Tisza River; 123+500-126+000 final design 1999
Left side bank of the Tisza River; 150+000-152+250 final design 1999
Right side bank of the Tisza River; 52+500 final design 1999
Right side bank of the Tisza River; 48+500-49+500 final design 1999
Right side bank of the Tisza River; 57+500-60+400 final design 1999
Regulation of the Mura River
1999
Regulation of shallow sections of the Danube between the 1881-1789 river km, Phase I., II. and III. final design 1998
Regulation of shallow sections of the Danube between the 1881-1789 river km preliminary design 1997
Regulation of the Pinka Creek near Szentpéterfa investment program 1996

 

C. Lake regulation

Kis-Balaton Water Protection System; Phase I. and II. studies, preliminary designs and final designs 1980-2007
Bank protection works in Agárd final design 1997