References Flood prevention: New Vásárhelyi Plan

References: Flood prevention - New Vásárhelyi Plan

 

New Vásárhelyi Plan (VTT)

Cigánd-Tiszakarád reservoir, Phase ”A” final design 2006
Levee reconstruction in the residential area of Tokaj (Tisza right side) design for construction tender 2006
Reconstruction works in the Middle-Tisza region (8 levee sections)
2006
Reconstruction works in the Lower-Tisza region (8 levee sections and 3 channels connecting to pump stations)
2006
Cigánd-Tiszakarád flood control reservoir (VTT Tender II.) modified preliminary design 2006
Cigánd-Tiszakarád flood control reservoir Phase ”B” (VTT Tender II.) design for construction tender 2006
Levee reconstruction (Szolnok, Gutenberg square)
2006
developing guidelines for the improvement of the recreational area at Tivadar – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.)
2005
establishing the hydraulic corridor at Szatmárcseke – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.)
2005
removal of natural levees on the floodplain between Csongrád and Szolnok – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.)
2005
removal of natural levees on the floodplain between Szeged and Tiszaalpár – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.)
2005
Improvement of the floodplain area around the port at Szeged – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.)
2005
Nagykörű flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.)
2005
Nagykunság flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.)
2005
Hany-Tiszasüly flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.)
2005
Szamos-Kraszna köz flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.)
2005
Updating the technical appendices of the Romanian-Hungarian flood protection regulations (INTERREG HU-2002/00062703-20)
2004
Establishing the high water flow zone at Gulács – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
New bank protection on the left bank (710,00-710,40 river km) – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
Improving the condition of the high bank at Rákócziújfalu – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
Improving the condition of the high bank at Vezseny – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
Establishing the high water flow zone at Tószeg – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
Establishing the high water flow zone at Bivaly-tó – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
Establishing the high water flow zone at Vezseny – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
Establishing the high water flow zone at Mártély – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) Preliminary design 2004
b. package
2004
Strenghtening the bank protection at Kisar – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Levelling works around the floodplain bridge at tivadar – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Partial removal of thesummer levee at Szanda – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Partial removal of the summer levee at Tiszajenő – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Partial removal of the summer levee at Tiszabög – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Partial removal of the summer levee at Nagyrév – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Relocation of the levee section at Bivaly-tó – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Flood channel at Csanytelek – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Flood channel at Mindszent – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Bank protection on the right bank of the Tisza downstream of the mouth of the Körös River – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Removal of roads in the Lower-Tisza region – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) Preliminary design 2004
Tiszaroff flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) Preliminary design 2004
Cigánd flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) Preliminary design 2004
Feasibility study Presentation of the current land use and owner structure of the floodplain Implementation program for 2004-2007 Feasibility study 2003
Implementation plan for improving the conveying capacity of the Tisza high water channel (Phase I.); land use and development program for improving living conditions in the related micro-regions (New Vásárhelyi Plan, Phase I/B: Tender III.) Feasibility study 2003
Feasibility study Hydraulic impact analysis and assessment Implementation program for 2004-2007 Feasibility study 2003
Implementation plan for Phase I. of the Tisza Valley flood control reservoir system (revitalisation of the floodplain by controlled releases); land use and development program for improving living conditions in the related micro-regions (New Vásárhelyi Plan, Phase I/A: Tender II.) Feasibility study 2003