References: Flood prevention - New Vásárhelyi Plan
New Vásárhelyi Plan (VTT)
Cigánd-Tiszakarád reservoir, Phase ”A” | final design | 2006 |
Levee reconstruction in the residential area of Tokaj (Tisza right side) | design for construction tender | 2006 |
Reconstruction works in the Middle-Tisza region (8 levee sections) | 2006 | |
Reconstruction works in the Lower-Tisza region (8 levee sections and 3 channels connecting to pump stations) | 2006 | |
Cigánd-Tiszakarád flood control reservoir (VTT Tender II.) | modified preliminary design | 2006 |
Cigánd-Tiszakarád flood control reservoir Phase ”B” (VTT Tender II.) | design for construction tender | 2006 |
Levee reconstruction (Szolnok, Gutenberg square) | 2006 | |
developing guidelines for the improvement of the recreational area at Tivadar – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.) | 2005 | |
establishing the hydraulic corridor at Szatmárcseke – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.) | 2005 | |
removal of natural levees on the floodplain between Csongrád and Szolnok – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.) | 2005 | |
removal of natural levees on the floodplain between Szeged and Tiszaalpár – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.) | 2005 | |
Improvement of the floodplain area around the port at Szeged – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package c.) | 2005 | |
Nagykörű flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) | 2005 | |
Nagykunság flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) | 2005 | |
Hany-Tiszasüly flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) | 2005 | |
Szamos-Kraszna köz flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) | 2005 | |
Updating the technical appendices of the Romanian-Hungarian flood protection regulations (INTERREG HU-2002/00062703-20) | 2004 | |
Establishing the high water flow zone at Gulács – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
New bank protection on the left bank (710,00-710,40 river km) – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
Improving the condition of the high bank at Rákócziújfalu – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
Improving the condition of the high bank at Vezseny – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
Establishing the high water flow zone at Tószeg – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
Establishing the high water flow zone at Bivaly-tó – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
Establishing the high water flow zone at Vezseny – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
Establishing the high water flow zone at Mártély – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package b.) | Preliminary design | 2004 |
b. package | 2004 | |
Strenghtening the bank protection at Kisar – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Levelling works around the floodplain bridge at tivadar – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Partial removal of thesummer levee at Szanda – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Partial removal of the summer levee at Tiszajenő – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Partial removal of the summer levee at Tiszabög – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Partial removal of the summer levee at Nagyrév – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Relocation of the levee section at Bivaly-tó – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Flood channel at Csanytelek – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Flood channel at Mindszent – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Bank protection on the right bank of the Tisza downstream of the mouth of the Körös River – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Removal of roads in the Lower-Tisza region – Designs of infrastructural works, designs for expropriation (VTT Tender III. - Package a.) | Preliminary design | 2004 |
Tiszaroff flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) | Preliminary design | 2004 |
Cigánd flood control reservoir – Designs of infrastructural works, designs for expropriation (VTT Tender II.) | Preliminary design | 2004 |
Feasibility study Presentation of the current land use and owner structure of the floodplain Implementation program for 2004-2007 | Feasibility study | 2003 |
Implementation plan for improving the conveying capacity of the Tisza high water channel (Phase I.); land use and development program for improving living conditions in the related micro-regions (New Vásárhelyi Plan, Phase I/B: Tender III.) | Feasibility study | 2003 |
Feasibility study Hydraulic impact analysis and assessment Implementation program for 2004-2007 | Feasibility study | 2003 |
Implementation plan for Phase I. of the Tisza Valley flood control reservoir system (revitalisation of the floodplain by controlled releases); land use and development program for improving living conditions in the related micro-regions (New Vásárhelyi Plan, Phase I/A: Tender II.) | Feasibility study | 2003 |